LMC Structural Liner Fact Sheet

With our exclusive LMC technology now you can line T and Y connections simply and effectively.  And since T & Y are a requirement for municipalities sewer contractors can now meet this need.

In fact both T and Y connections are no problem with the Formadrain steam cured five-in-one system, that’s been proven through many applications under diverse conditions since 1994 across the continent.

The Formadrain trenchless technology CIPP system can handle:

  • LMC (T & Y CONNECTIONS)
  • POINT (SPOT-SECTIONAL, SHORT) REPAIR
  • LATERAL LINING INDUSTRIAL LINING
  • MAN-HOLE TO MAN-HOLE
  • HIGH PRESSURE PIPES

The FORMADRAIN Liner has been in constant use since 1994 for rehabilitating laterals, point repairs and for man-hole to man-hole lining.

The Liner has proven itself under repeated use across North America, and is known for its high quality control during installation and for its exceptionally high mechanical properties.

Quality Assurance:

Quality is assured by our complete on-site training program, as well as our standardised Procedure Manual.

The technical aspects of the FORMADRAIN Liner itself also assure quality through the use of steam heat-curing system.

With our steam-curing process you can completely control the cure rate of the new Liner.

Steam Curing:

Although we were the first to use a steam-curing process, due to the pressures of today’s market virtually every other lining company has come to the same conclusion – that ambient curing is too inefficient.

We’ve been using a heat-cured process from the beginning and have perfected the system through 14 years of rigorous use.

Flexibility To Suit Your Needs:

T & Y Lining can be achieved at three levels: residential, municipal and industrial.

Sizes may vary from a 6’’ (150 mm) main combined with a 4’’ (100 mm) lateral, up to a 24’’ (600 mm) main combined with a 8’’ (200 mm) lateral.


To become an Authorized Formadrain Licensee, consult our Business Opportunity Section